| North Sea 1973 |
|
1973-Yarmouth, England- Sea & Land Pipelines
RoughNeck & Hoist Operation, Pipe Doper, Tong Monkey, Ship & Platform Salvage and Demolition.
Got an MBA in paint chipping!
|
1973-Stavangar Norway-Sea & Land Pipelines, . 17 year old green, rookie hoist operator pipe doper, tong monkey, roughneck. They should have paid the Brits extra to teach me how to get a bucket of steam!
|
| | Attended the Middle Eastern College of Counterweights and Ballast
|
Dubai-U.A.E, Bahrain, Saudi Arabia, Suez Canal. Platform Fabrication & Installation. Marine Salvage & Demolition of Ships, Barges, Tugs & Oil Rigs.
|
1974-J Ray McDermott- Kuwait Anchor Hoist Operator, Hycolog Drilling Rig Operator, Backup Derrick Operator, Relief Foreman, Pipe Layer and anything else I was told to do for $2.00 an hour. Even Learned to go Down Hole with Schlumberger.
|
1974 Kharg Island- Iran- Derrick Operator/Relief Foreman
Dredging, Offshore Pumping Station, Pipeline to and from. Even tossed a couple of platforms on the beach.
|
1974- Saudi Arabia- Derrick Operator/Foreman
Worked with these professional pipe pullers in the desert.
2 of em are now ex wives.
|
1979- Oceanic Engineering-Brasil-700 Ton Derrick Operator.
Dive Job, Core Samples, Dock & Bridge, Pipe Laying & Inspection,
|
Borneo- Oceanic Engineering-Operator/Anchor Foreman
Running Pipe off Cambodia and Brunei
|
79- 90- Boh Borthers Engineering - Operator- Pile Driving/Bridge & Dolphin Repair/ in Mississipi River. Salvaged a couple of barges and tugs beached by hurricanes.
|
79- 90 Operator and Superintendant- Dredging the Mississipi River
|
90-95 OCEAN SALVAGE INC. Superintendant/Heavy Lift Operator- Salvaged over 100 EPA Condemned Platforms, Rigs, Tugs, Barges
|
1996 - 13 Story San Francisco Towers - Primavera Suretrak - Construction Claims Management
|
1996 - Valley Medical Center in San Jose - Primavera - Construction Claims Management
|
| | ROV Dam & Power Plant Intake Inspection Work - Planner Scheduler Project Manger - Primavera P3
|
San Francisco Ferry Terninal- Project Manager/Inspector/Business Development
Fabrication, Painting and Delivery of Ferry Terminal along with Business Development Responsibilities.
|
WF George Dam- Project Manager/Business Devopment Primavera Scheduling 2 year Dive Project- 48" Secant Pile Drilling
|
Pan Marine Diving- Business Development/Project Management- Primavera Scheduling San Francisco Outfalls and Bay Bridge
|
Primavera Scheduling
Barge Curtain Turbidity Screen Installation
|
Barge Fabrication & Repair
|
Marine Salvage Consulting- Equipment Sales/Leasing Primavera Scheduling Barge & Fabrication Terminal for San Francisco Bay Bridge Contracts
|
 |
| San Francisco Tube |
|
2004 - 2005 Resdident Engineer - Inspector Acumen for Jacobs Engineering - Parsons Brinkerhoff- Bechtel, BART's general engineering consultants, were charged with seismic retrofit and construction management of the total project. The plan was to place stone columns along side the tube to eliminate potential shift during an earthquake using vibratory methods. build the tube in sections, 57 in all, each averaging 330 feet in length, longer than a football field. These were fabricated on dry-land shipways, at the Bethlehem Shipyards in South San Francisco, from which they were launched, towed into the bay, and sunk in their proper positions.
|
2005 - 2006 - Savanna Grand, Illinois - Construction Management - Project Management - Primavera Scheduling
|
| 2006 to 2009 Barge and Ship Salvage - Project Manager - Manage Divers, Operators, Environmental Companies in the Salvage of Ships and Barges and the dismantle process.
|
|